CANDIA, NH -JOB #35427

Dec 10, 2020

Overview / Update Job #35427

Week ending January 9, 2021  –Since the last report, the cab was in staging and the chassis frame arrived. The fire pump also arrived. Next week the cab and chassis frame should be in staging. The pump house structure could begin fabrication and the fire pump could begin to receive valves and plumbing . The body should begin fabrication.

Latest from the Factory Floor