Overview / Update Job #35860-02

Week ending May 8, 2021  –This week the cab continued the paint process and the chassis frame arrived. T he pump house structure along with the fire pump remained in staging (no photos ) and the body began the paint process . Next week the cab should finish with paint and the chassis frame should continue with assembly . The pump house structure should be joined with the fire pump and the body should finish with paint.