MERRIMACK, NH -JOB #35860

Apr 8, 2021

Overview / Update Job #35860

Week ending April 2, 2021  –Your

Your new Pierce apparatus is now in production at the Bradenton, FL facility . This week the cab began fabrication and the fire pump arrived. The body began fabrication. Next week the cab should finish with fabrication and the chassis frame may arrive. The pump house structure should begin fabrication and the fire pump may begin to receive valves and plumbing. The body should continue with fabrication.

Latest from the Factory Floor

  • Week ending April 2, 2021
  • Leave a Reply

    Your email address will not be published. Required fields are marked *