PERU, VT -JOB #34978

Feb 10, 2021

Overview / Update Job #34978

Week ending February 20, 2021  –This week the chassis arrived, and the fire pump was in staging. The body finished with fabrication. Next week the chassis should be in staging , and the pump house structure should be fabricated. The fire pump could begin to receive valves and plumbing, and the body could begin the paint process .

Latest from the Factory Floor

Leave a Reply