Overview / Update Job #35597-03

Week ending February 27, 2021  –This week the cab began the paint process and the chassis frame arrived. The pump house structure began fabrication and the fire pump continued to receive valves and plumbing. The body began the paint process. Next week the cab should finish with paint and the chassis frame should be in staging. The pump house structure could be joined with the fire pump and the body should finish with paint.