WALPOLE, NH -JOB #35500

Dec 15, 2020

Overview / Update Job #35500

Week ending January 9, 2021  –Since the last report, the cab and fire pump were in staging. The body began fabrication. Next week the cab should be in staging and the chassis frame may arrive. The pump house structure should begin fabrication and the fire pump may begin to receive valves and plumbing. The body should continue with fabrication.

Latest from the Factory Floor

Leave a Reply

Your email address will not be published. Required fields are marked *