In-Production Apparatus
Job# 43892
Initial Report
October 08, 2026
Congratulations -Your new Pierce apparatus is now in production at the Bradenton, FL facility! This week your cab was fabricated and began the paint process, the pump began assembly, and the body was fabricated and began in paint with metal finishing. In the next report your cab may complete the paint process, the pump may continue assembly, and the body may continue through paint.