Saugus MA Job# 40304

Written by AFR Team | Jun 16, 2026 1:09:54 PM

In-Production Apparatus

Job# 40304

Status Update

June 12, 2026

In this report your cab completedinitial assembly, the frame build continued, the pump house was staged, and the body continued through paint. In the next report your cab may be staged, the frame build may continue, the pump house may bestaged, and the body may complete the paint process.

Status Update

June 05, 2026

In this report your cab began initial assembly, the frame build began, the pump house completedinitial assembly, and the body completedfabricationand began the paint process with metal finishing. In the next report your cab may continueinitial assembly, the frame build may continue, the pump house may remain staged, and the body may begin the paint process.

Status Update

May 22, 2026

In this report your cab completed paint, the pump house began initial assembly, and the body began fabrication. In the next report your cab may begin initial assembly, the pump house may continue initial assembly, and the body may complete the fabrication process.

Status Update

May 15, 2026

In this report your cab continued the paint process while the pump house structure was fabricated. In the next report your cab may continue through paint while the pump house structure may remain staged.

Status Update

May 08, 2026

In this report your cab continued through paint. In the next report your cab may continue the paint process.

Status Update

May 01, 2026

In this report your cab completed fabrication and began the paint process. In the next report your cab may continue through paint.

Initial Report

April 17, 2026

Congratulations -Your new Pierce apparatus is now in production! This week your cab began fabrication. In the next report your cab may continue the fabrication process.