Lincoln Fire Department, MA F7504

Update Feb 17, 2023: Lincoln FD’s cab and body remain offsite for paint, the frame has started initial assembly, the pump house continued refurbishment while the torque box and aerial device remain staged. 

In the next report the cab and body may be available for photos, the frame build may continue, the pump house may continue refurbishment while the torque box and aerial device may remain staged.

Update January 22, 2023: In this report Lincoln’s cab and body were offsite for paint, the frame rails are staged for initial assembly, while the pump house, torque box and aerial device remain staged.

In the next report the cab and body may be available for photos, the frame rails may remain staged for initial assembly and the pump house, torque box and aerial device may remain staged.

January 9, 2023: Lincoln FD’s cab was offsite for paint, the frame was unavailable for photos, the pump house completed paint and was staged, the torque box was staged, the body was offsite for paint, and the aerial device remained staged. In the next report refurbishment may continue where needed, and the cab, frame, and body may be available for photos.

December 19, 2022: Lincoln FD’s cab was staged, the frame was unavailable for photos.  The pump house started in paint, the torque box began initial assembly, and the body and aerial device were staged .

In the next report refurbishment may continue where needed, and the frame may be available for photos.

November 18, 2022: In this report your apparatus continued refurbishment. In the next report, refurbishment may continue where needed.

Leave a Reply

Your email address will not be published. Required fields are marked *