Hudson MA Job# 42355

In-Production Apparatus

Job# 42355

Status Update

September 25, 2026

In this report your cab began initial assembly, the frame build began, the pump house was staged to continue initial assembly, and the body beganthepaint processwithmetalfinishing. In the next report your cab may continueinitial assembly, the frame build may continue, the pump house may continue initial assembly, and the body may continue through paint.

Photo 1Photo 2Photo 3Photo 4
Photo 5Photo 6Photo 7

Status Update

September 18, 2026

In this report your cab completed paint and was staged, the pump house was painted then staged to continue initial assembly, and the body completed fabrication but was unavailable for photos. In the next report your cab may begin initial assembly, the pump house may continue initial assembly, and the body may be available to photograph.

Photo 1Photo 2

Status Update

September 04, 2026

In this report your cab continued the paint process, the pump house began initial assembly, and the body began fabrication. In the next report your cab may continue through paint, the pump house may continue initial assembly, and the body may complete the fabrication process.

Photo 1Photo 2Photo 3Photo 4

Status Update

August 28, 2026

In this report your cab was staged to continue through paint. In the next report your cab may continue the paint process.

Photo 1Photo 2

Status Update

August 21, 2026

In this report your cab completedfabrication and began the paint process in metal finishing. In the next report your cab may continue through paint.

Photo 1Photo 2

Status Update

August 07, 2026

In this report your cab continuedthefabricationprocess. In the next report your cab may completethe fabrication.

Photo 1Photo 2

Initial Report

July 31, 2026

Congratulations -Your new Pierce apparatus is now in production! This week your cab began fabrication. In the next report your cab may continue the fabrication process.

Photo 1Photo 2